
Strong Growth for the Welding Division
March and April 2025 marked another incredible period for our Welding Division, with record-breaking performance and continued strong growth across multiple projects.
RSS Infrastructure’s Rail Welding division provides specialist welding, weld repair, rail grinding and testing for main line railways, tramways and light rail across the UK. Our team of nearly 100 welders delivers around 10,000 welds a year, with a 99% first-time acceptance rate.
The division grew from the acquisition of Carillion Welding by RSS Infrastructure in 2019. We are based in Doncaster and Tonbridge, with regional offices in Alnwick, Cwmbran, Romford and Stoke-on-Trent.
We invest continuously in training and development, including Level 1–3 Stressing Officer competency training, so we can supply fully qualified teams for large-scale rail welding projects.
We work for Network Rail and for principal contractors including Balfour Beatty, Colas Rail, Babcock Rail, Trackwork, Pod-Trak, VolkerRail, Midland Metro and Story Rail, from single weld repairs to large renewal and tram projects.
Our welds achieve a 99% first-time acceptance rate. Our senior management team has long experience of managing major UK rail welding projects, and we are corporate members of the Institute of Rail Welding (IoRW).
Our Welding division holds ISO 9001, ISO 14001 and ISO 45001 certification and Achilles accreditation, and our welding processes and systems meet ISO 3834, the international standard for welding quality. We manage every stage, from planning and scoping to delivery, inspection and handback.
Our teams use up-to-date equipment, including Robel ROGRIND 13.49 rail head profile grinding machines, to finish welds accurately to the rail profile.
Call 0330 113 0004 to discuss your rail welding project with our team, led by Welding Services Director Karl Dean.
Rail welding joins lengths of rail into continuous welded rail and repairs rail defects. On track in Britain, rails are mainly joined by aluminothermic (Thermit) welding; flash butt welding is used in depots and by mobile welding machines; and arc welding is used to repair rail heads and switches and crossings.
We offer aluminothermic (Thermit) welding, tram, light rail and crane rail welding, weld inspection, manual metal arc (MMA) welding and repairs, oxy-acetylene and oxy-propane burning, RCF grinding, switch and crossing grinding and inspection, and VERSE testing. See our rail welding brochure.
Yes. Our welders hold TW 1–5A competences for tram and light rail welding, including embedded track in city centres and crane rail. We installed more than 2,800 aluminothermic welds on the Nottingham tram extension.
Yes. With nearly 100 welders delivering around 10,000 welds a year, we have the capacity for large-scale rail and light rail projects, and our investment in training means we can supply fully qualified teams.
Read about the Welding Division’s recent growth.
ISO 9001, ISO 14001 and ISO 45001 certification and Achilles accreditation. Our welding processes and systems meet ISO 3834, the international standard for welding quality, and we are corporate members of the Institute of Rail Welding.
Across the UK. We are based in Doncaster and Tonbridge, with regional offices in Alnwick, Cwmbran, Romford and Stoke-on-Trent.

March and April 2025 marked another incredible period for our Welding Division, with record-breaking performance and continued strong growth across multiple projects.

Head Wash Repair (HWR), a specialised aluminothermic welding technique, is an innovation that is revolutionising rail maintenance.