Using the Thermit Welding technique

Using the Thermit Welding Technique on the Rail Infrastructure

Thermit welding, also called thermite or aluminothermic welding, joins two rail ends by filling the gap between them with molten steel. The steel is made on the spot: a mixture of aluminium powder and iron oxide is ignited in a crucible above the joint, and the steel it produces runs into a mould around the rails and fuses with them.

Key facts

  • The reaction: aluminium powder reduces iron oxide, releasing intense heat. It approaches 2,760 °C (5,000 °F) and produces molten steel of around 1,930 °C (3,500 °F), with aluminium oxide slag floating on top.
  • No external power is needed for the weld itself, which is why it suits work on track, away from depots.
  • Time per weld: Network Rail puts an aluminothermic weld at a minimum of 90 minutes including grinding, against 30–45 minutes for a flash butt or induction weld.
  • Scale: Network Rail recorded around 30,000 maintenance and 10,000–15,000 renewal aluminothermic welds in 2016/17, with a national rejection rate of about 2.29%.
  • Name: Thermit® is a registered trademark of the Goldschmidt group, whose founder Hans Goldschmidt developed the process in the 1890s. The general term is aluminothermic welding.

How does Thermit welding work?

  1. Prepare the rails. The rail ends are cut square, set to the gap the welding procedure specifies, and aligned for level and line.
  2. Fit the mould. A pre-formed refractory sand mould is clamped around the gap and sealed.
  3. Preheat. The rail ends are heated with a gas torch through the mould to the temperature set by the procedure.
  4. Ignite the portion. A single-use crucible holding the Thermit portion is placed over the mould and ignited. The reaction takes seconds.
  5. Pour. The molten steel runs into the mould, fills the gap and fuses with the rail ends. The lighter slag collects separately.
  6. Trim and finish. Once the steel has solidified, the mould is removed, excess metal is trimmed from the railhead, and the weld is ground to the rail profile.
  7. Inspect. The finished weld is checked for alignment and profile and tested ultrasonically for internal defects before it is signed off.

Where is Thermit welding used on the railway?

  • Closure welds when laying continuous welded rail on site.
  • Rail defect and broken rail repairs, where a defective length is cut out and a new piece of rail is welded in at each end.
  • Switches and crossings, where the space between components often rules out other methods. Network Rail notes that welding of modular S&C is limited to aluminothermic for this reason.
  • Tram and light rail, including embedded track. RSSI welders installed more than 2,800 aluminothermic welds on the Nottingham tram extension.
  • Railhead repairs. Head Wash Repair uses an aluminothermic process to repair defects in the railhead without replacing the rail.

Thermit welding vs flash butt welding

Thermit (aluminothermic) Flash butt
How the heat is made Chemical reaction; no power supply needed Electric current and pressure from a welding machine
Filler metal Yes, steel from the reaction None; the rail ends are forged together
Where it is done On track, including switches and crossings In a depot, or on track with a mobile flash butt machine on plain line
Time per weld (Network Rail) At least 90 minutes including grinding 30–45 minutes including grinding

Flash butt welds tend to batter less under traffic. A 2025 study of more than 2,000 welds over 20 years found that initial quality was similar for both methods, but that thermite welds developed battering (a dip at the weld under traffic) around 25 times faster. That is why Thermit welding is usually the choice where flash butt welding isn’t practical, rather than a like-for-like alternative.

What makes a good Thermit weld?

Network Rail notes that weld quality is operator-dependent and needs a high level of individual skill. The main factors are:

  • the correct rail gap and accurate alignment before the pour;
  • a dry, correctly sealed mould and the right preheat;
  • the approved portion for the rail steel and profile being welded;
  • careful trimming and grinding to the rail profile, followed by inspection and ultrasonic testing.

Because the process involves molten metal and sparks, welders also work to strict controls: protective equipment, a clear zone around the crucible, and fire precautions near lineside vegetation.

Thermit welding at RSS Infrastructure

Our rail welding team, led by Welding Services Director Karl Dean, has nearly 100 welders and delivers around 10,000 welds a year, with a 99% first-time acceptance rate. Speak to our welding team about your next project.

Related reading: What is Head Wash Repair (HWR) in rail welding?

Sources

Share this post

About Us

RSS Infrastructure (RSSI), based in Birmingham, Cwmbran, Doncaster and Tonbridge, provides infrastructure services for the rail, civil, and utilities sectors. We serve clients like Network Rail, WMCA, HS2 and Tier 1 & 2 contractors. Our services include Arboriculture, Civils and Construction, Geofencing, Industrial Rope Access (IRATA), Magnetic Track Safety, Rail Operations including Possession Management and P/Way, Rail Welding, Signalling, and Track Warning Services.