Vegetation Removal from Rail Road Bridge and Footbridge
RSS Infrastructure (RSSI) undertook a challenging project to remove vegetation from a railway road bridge and a footbridge.
Home | Wharf Road Development
“We understood the client’s urgency and the project’s ecological sensitivities. Our experienced team provided a survey and a pathway for future development in compliance with environmental standards.”
Avaro Midlands Limited contracted the Ecology Services Division of RSSI for an ecological survey of the Wharf Road Development at Kings Norton, Birmingham. The £1.6k project spanned three weeks and was essential to secure planning permission to construct 14 residential dwellings. The previous survey had expired, and the newly acquired land’s canal-side location posed access difficulties, halting the client’s development efforts.
Location
Wharf Road, Kings Norton
Project Value
£1,600
Division
Ecology
Project Duration
3 Weeks
The project required a qualified and experienced ecologist to lead on-site visits and conduct comprehensive surveys. The team’s competencies in ecological assessments were augmented by tablet technology for mapping and accessing Local Records Centre data. Despite the ongoing nature of the project and the anticipation of further recommendations, the value delivered thus far has been in re-establishing the viability of the client’s development plans in an environmentally compliant manner.
While the project report is pending finalisation, initial feedback suggests that the work conducted will greatly facilitate the client’s planning permission process.. Additionally, recommendations for further ecological work indicate RSSI’s thorough and proactive approach, providing the client with a comprehensive ecological framework for their development project.
RSS Infrastructure (RSSI), based in Birmingham, Cwmbran, Doncaster and Tonbridge, provides infrastructure services for the rail, civil, and utilities sectors. We serve clients like Network Rail, WMCA, HS2 and Tier 1 & 2 contractors. Our services include Arboriculture, Civils and Construction, Geofencing, Industrial Rope Access (IRATA), Magnetic Track Safety, Rail Operations including Possession Management and P/Way, Rail Welding, Signalling, and Track Warning Services.
RSS Infrastructure (RSSI) undertook a challenging project to remove vegetation from a railway road bridge and a footbridge.
Taziker was awarded a contract to replace life-expired wheel timbers on a series of bridges in the Manea area between Ely and March.
Welding S&C Unit was contracted to work on Phase 2 of the Birmingham Midland Metro Alliance or MMA Westside Extension.
Copyright © 2024 RSS Infrastructure Ltd.
Company Registration No. 06278727
Get notified about new articles