Vegetation Removal from Rail Road Bridge and Footbridge
RSS Infrastructure (RSSI) undertook a challenging project to remove vegetation from a railway road bridge and a footbridge.
Home | West Hampstead Maintenance Depot
“RSS Infrastructure’s flexible staffing solutions have been crucial in enabling completion of maintenance and minor renewals at the West Hampstead Maintenance Depot on time and to the highest standards. Our skilled signalling teams have been invaluable in boosting the team size for night shifts and ensuring the safety and reliability of the signalling systems.”
As part of the Network Rail Framework Agreement for the Provision of Labour Services, RSS Infrastructure has been supplying signalling teams to assist in the regular depot maintenance and minor renewals carried out by Network Rail at West Hampstead. The RSS Infrastructure staff is competent in various signalling equipment and fault-finding experience, enabling them to support the teams carrying out maintenance and faulting.
Supplied signalling teams to assist in the regular depot maintenance and minor renewals.
Provided staff to boost team size for day or night shifts.
Ensured that all staff were competent in various signalling equipment and fault-finding experience.
Supplied staff with the latest version of Network Rail standards to work on-site.
Location
West Hampstead
Project Value
£116,000
Division
Signalling
Project Duration
Ongoing
As part of the Network Rail Framework Agreement for the Provision of Labour Services, RSS Infrastructure has been supplying signalling teams to assist in the regular depot maintenance and minor renewals carried out by Network Rail at West Hampstead. This includes providing staff to boost team size for night shifts, ensuring that maintenance and minor renewals are completed on time and to the highest standards.
The RSS Infrastructure staff is competent in various types of signalling equipment, including track circuits, axle counters, filament signals, LED signals, various point operating equipment, earth readings, and voltage and current readings. They also have fault-finding experience, which is invaluable to Network Rail due to the nature of the work being carried out.
To ensure the safety and reliability of the signalling systems, all staff supplied by RSS Infrastructure were issued with the latest version of Network Rail standards, which they work to on-site. This included the NR/L3/SIG/10064 General Instructions to Staff Working on S&T Equipment Issue 10 04/12/2021, NR/L3/SIG/10663 Signal Maintenance Specifications Issue 18 04/12/2021, and NR/L3/SIG/11231 SMTH Work Instruction Issue 16 04/12/2021. By supplying skilled signalling teams on an ongoing basis, RSS Infrastructure has provided flexible staffing solutions that enable Network Rail to complete maintenance and minor renewals, even if faults are reported and some team members have to leave to attend to them. This ensures that the West Hampstead Maintenance Depot signalling project is completed on time and to the highest standards.
RSS Infrastructure (RSSI), based in Birmingham, Cwmbran, Doncaster and Tonbridge, provides infrastructure services for the rail, civil, and utilities sectors. We serve clients like Network Rail, WMCA, HS2 and Tier 1 & 2 contractors. Our services include Arboriculture, Civils and Construction, Geofencing, Industrial Rope Access (IRATA), Magnetic Track Safety, Rail Operations including Possession Management and P/Way, Rail Welding, Signalling, and Track Warning Services.
RSS Infrastructure (RSSI) undertook a challenging project to remove vegetation from a railway road bridge and a footbridge.
Taziker was awarded a contract to replace life-expired wheel timbers on a series of bridges in the Manea area between Ely and March.
Welding S&C Unit was contracted to work on Phase 2 of the Birmingham Midland Metro Alliance or MMA Westside Extension.