Vegetation Removal from Rail Road Bridge and Footbridge
RSS Infrastructure (RSSI) undertook a challenging project to remove vegetation from a railway road bridge and a footbridge.
Home | Selhurst Eurostar Train Depot
“RSS Infrastructure’s flexible staffing solutions have been invaluable in enabling us to carry out maintenance at the Selhurst Eurostar Train Depot on time and to the highest standards. Our skilled technicians have helped us to meet client’s contractual agreements and ensure the safety and reliability of the depot’s signalling systems.”
Trackwork was contracted to maintain the Eurostar Depot at Selhurst but required additional staff to cover sickness or leave. RSS Infrastructure provided a technician to assist with maintenance on various equipment, including HVI tracks circuits, earth testing, signals, treadles, and points, as well as a point fitter for minor renewals on points
Location
Selhurst
Project Value
£4,164.50
Division
Signalling
Project Duration
11 Days
Trackwork was contracted to maintain the Eurostar Depot at Selhurst but required additional staff to cover sickness or leave. To help them meet their contractual obligations, RSS Infrastructure provided a technician to assist with maintenance on various equipment, including HVI tracks circuits, earth testing, signals, treadles, and points. This ensured that the signalling systems were operating correctly and met the required safety and reliability standards.
In addition, RSS Infrastructure supplied a point fitter for minor renewals on points, including timber renewal, half set of switch renewal, and stretcher bar renewal. This ensured that the points were functioning correctly and met the standards stipulated by Network Rail.
By supplying staff on an ad hoc basis, RSS Infrastructure was able to provide flexible staffing solutions that enabled Trackwork to complete maintenance on time and meet their contractual agreements. This ensured the safety and reliability of the Selhurst Eurostar Train Depot’s signalling systems.
Overall, RSS Infrastructure’s expertise and flexible staffing solutions helped to ensure the successful completion of the Selhurst Eurostar Train Depot signalling project. Their skilled technicians assisted with maintenance on various equipment and minor renewals on points, enabling Trackwork to meet their contractual obligations and ensure the safety and reliability of the signalling systems.
RSS Infrastructure (RSSI), based in Birmingham, Cwmbran, Doncaster and Tonbridge, provides infrastructure services for the rail, civil, and utilities sectors. We serve clients like Network Rail, WMCA, HS2 and Tier 1 & 2 contractors. Our services include Arboriculture, Civils and Construction, Geofencing, Industrial Rope Access (IRATA), Magnetic Track Safety, Rail Operations including Possession Management and P/Way, Rail Welding, Signalling, and Track Warning Services.
RSS Infrastructure (RSSI) undertook a challenging project to remove vegetation from a railway road bridge and a footbridge.
Taziker was awarded a contract to replace life-expired wheel timbers on a series of bridges in the Manea area between Ely and March.
Welding S&C Unit was contracted to work on Phase 2 of the Birmingham Midland Metro Alliance or MMA Westside Extension.
Copyright © 2024 RSS Infrastructure Ltd.
Company Registration No. 06278727
Get notified about new articles