RSS Infrastructure (RSSI) undertook a challenging project to remove vegetation from a railway road bridge and a footbridge.
Home | Warrington Power Station Project
“We were impressed with the team’s dedication and professionalism on the Warrington Power Station project. They overcame challenges and delivered the project within the given timeline and budget. The solution provided was effective, and we appreciate their hard work. We would recommend their services to others.”
This Rail Projects project involved examining a private third-party owned structure for the client. The inspection report aimed to determine whether heavier vehicles could be used across the structure, which would increase productivity. The solution provided included several aspects; supplying a team including a COSS and bridge examiners, suppling PASMA towers, organising line blocks and the supply of a road over rail crane. To facilitate the examination, a road closure was organised to the plant.
Location
Warrington
Project Value
£25,000
Division
Rail Operations
Project Duration
7 Days
Ridge was the client for the Warrington Power Station project, which had a value of £6k and a duration of one week. The project involved examining a private thirdparty owned structure for the client. The examination aimed to determine whether heavier vehicles could be used across the structure, which would increase productivity.
To facilitate the examination, a road closure was organised to the plant. The solution provided included a team, COSS, PASMA towers, line blocks, road closure, bridge examiners, and supply road over rail crane.
The bridge to the power station had to be closed, and line blockages and sidings possession had to be organised. Third-party land owners’ agreements had to be obtained.
This was a challenging project to gain all stakeholder buy-in and agreements. However, the team successfully delivered the project within the given timeline and budget.
RSS Infrastructure (RSSI), based in Birmingham, Cwmbran, Doncaster and Tonbridge, provides infrastructure services for the rail, civil, and utilities sectors. We serve clients like Network Rail, WMCA, HS2 and Tier 1 & 2 contractors. Our services include Arboriculture, Civils and Construction, Geofencing, Industrial Rope Access (IRATA), Magnetic Track Safety, Rail Operations including Possession Management and P/Way, Rail Welding, Signalling, and Track Warning Services.
RSS Infrastructure (RSSI) undertook a challenging project to remove vegetation from a railway road bridge and a footbridge.
Taziker was awarded a contract to replace life-expired wheel timbers on a series of bridges in the Manea area between Ely and March.
Welding S&C Unit was contracted to work on Phase 2 of the Birmingham Midland Metro Alliance or MMA Westside Extension.
Copyright © 2024 RSS Infrastructure Ltd.
Company Registration No. 06278727
Get notified about new articles