“The key challenge faced were supply chain issues which cascaded down during the initial phase of the work. We were able to adjust our programme to keep things moving as efficiently as possible, ultimately leading to the successful completion of the project. This required strategic problem-solving and a high degree of adaptability on our part.”

Dave Bamford, Head of Civils & Construction

Services Delivered

RSSI Civils & Construction division successfully completed the DIRFT Freight Rail Depot project for their client, Fenix. Contracted for a sum of £122,000, the project spanned 36 days under the careful supervision of Andy Munday. Despite challenges related to material deliveries, RSSI demonstrated resilience and adaptability, ensuring the project’s successful completion.

Key Actions

  • Identified and addressed material delivery problem
  • Successfully installed all components of the civils aspect, including one
    rectification, which had no impact on the overall project
  • Adapted the project programme to accommodate initial supply chain
    issues, ensuring work continued timeframe
  • Collaborated effectively with the client to work around the supply chain issues
DIFT Freight Rail Depoit
location-icon

Location

Daventry

Project Value

£122,000

Division

Civils & Construction

Project Duration

36 Days

Project Delivery

The project’s backdrop was a contract with the S&T department and Fenix, which led to the RSSI Civils Division’s involvement with the civils aspect of the DIRFT Freight Rail Depot project.

Challenges arose in the form of late material deliveries which were linked to supply chain issues that initially cascaded down through the project. This pushed back the project timeline, potentially impeding the client’s ability to complete the work. However, the team proved adept at navigating this problem. Rather than letting it hinder progress, they adjusted the programme to ensure that other aspects of the project continued unhindered.

This demonstrated their capability to adapt to situations and still deliver high-quality results.

Any issues or problems that arose were dealt with swiftly and without any negative impact on the project, further evidencing RSSI’s commitment to quality and their client-focused approach.

RSSI’s collaborative efforts in dealing with the delivery problems were well appreciated by Fenix, adding value to the client relationship. The DIRFT Freight Rail Depot project is a prime example of RSSI’s ability to overcome obstacles and deliver successful results on time, even under challenging circumstances.

About Us

RSS Infrastructure (RSSI), based in Birmingham, Cwmbran, Doncaster and Tonbridge, provides infrastructure services for the rail, civil, and utilities sectors. We serve clients like Network Rail, WMCA, HS2 and Tier 1 & 2 contractors. Our services include Arboriculture, Civils and Construction, Geofencing, Industrial Rope Access (IRATA), Magnetic Track Safety, Rail Operations including Possession Management and P/Way, Rail Welding, Signalling, and Track Warning Services.