Home / News / Possession Management / What is the Weekly Operating Notice (WON) in the Rail Industry?
News
What is the Weekly Operating Notice (WON) in the Rail Industry?

What is the Weekly Operating Notice (WON) in the Rail Industry?

The Weekly Operating Notice (WON) is Network Rail’s weekly publication of planned changes to the railway for each route: engineering work and possessions, temporary speed restrictions, alterations to track and signalling, and changes to local operating instructions. Train drivers, signallers and everyone planning or carrying out work on the line use it to know what is different on the railway that week.

Key facts

  • Who publishes it: Network Rail, for each route.
  • How often: every week.
  • What governs it: RSSB’s Rail Industry Standard RIS-3215-TOM, which covers the Weekly Operating Notice, the Periodical Operating Notice and the Sectional Appendix.
  • How changes flow: changes are published first in the WON, then carried into the Periodical Operating Notice (PON) and incorporated into the Sectional Appendix, which Network Rail now publishes electronically as the National Electronic Sectional Appendix (NESA).
  • What it is not: the WON covers planned changes. Unplanned incidents are managed through railway control and emergency arrangements, not the WON.

What is in the Weekly Operating Notice?

RIS-3215-TOM describes the information published through the WON, PON and Sectional Appendix as covering:

  • engineering work, such as possessions and line blockages, with their dates, times and limits;
  • alterations to track and signalling arrangements, such as new or altered signals and track layouts brought into use;
  • local operating instructions for particular locations;
  • localised amendments to National Operations Publications, such as the Rule Book modules and working manuals.

The WON also publishes temporary speed restrictions, so drivers know where they must slow down.

WON, PON and Sectional Appendix: what is the difference?

Weekly Operating Notice (WON) Periodical Operating Notice (PON) Sectional Appendix (NESA)
Published Weekly Each period, route by route Continuously updated online
Contains The week’s planned engineering work, speed restrictions and alterations Items published for the first time (Part 1) and earlier items still in force (Part 2) The permanent reference description of each route and its operating arrangements
Role First place changes appear Carries lasting changes forward between WONs and the Sectional Appendix Where lasting changes end up

Who uses the WON?

  • Train drivers and operators, to know about engineering work, speed restrictions and changes on the routes they work.
  • Signallers, to know which possessions and line blockages are planned.
  • People in charge of work on the line, such as the Person in Charge of the Possession (PICOP), Engineering Supervisors and COSSs, to confirm the arrangements for their work.
  • Planners and contractors, to check their planned access has been published correctly and to avoid clashes with other work.

How does work get into the WON?

Engineering access is planned well in advance through Network Rail’s possession planning process. Possessions and line blockages are applied for through Network Rail’s Possession Planning System (PPS), checked for conflicts with other work, and then published in the WON for the week they take place. See our guides to possession planning with NROL3 and PICOP briefings.

How RSS Infrastructure supports WON planning

Our Possession Management team, led by Head of Rail Operations John Byrne, prepares engineering access applications in the Possession Planning System, works with Network Rail to identify and remove conflicts within the worksite, manages cancellations, and plans and inputs line blockages for publication in the Weekly Operating Notice.

Sources

Share this post

About Us

RSS Infrastructure (RSSI), based in Birmingham, Cwmbran, Doncaster and Tonbridge, provides infrastructure services for the rail, civil, and utilities sectors. We serve clients like Network Rail, WMCA, HS2 and Tier 1 & 2 contractors. Our services include Arboriculture, Civils and Construction, Geofencing, Industrial Rope Access (IRATA), Magnetic Track Safety, Rail Operations including Possession Management and P/Way, Rail Welding, Signalling, and Track Warning Services.

Recent Articles