Vegetation Removal from Rail Road Bridge and Footbridge
RSS Infrastructure (RSSI) undertook a challenging project to remove vegetation from a railway road bridge and a footbridge.
Home | SAS Bridge Skanska HS2 Project
“RSSI is providing a fully robust possession planning solution to support the project from start to finish, from inception to delivery. Our team provide a full range of worksite management services, including all safety-critical personnel and isolations, providing the client an efficient and cost-effective solution from a single source.”
Possession Planning and Management, Isolations, Worksite Management, De-vegetation, Fence Installation, and Civils work are services provided by RSS Infrastructure on this project.
Location
Birmingham
Project Value
£TBC
Division
Rail Operations
Project Duration
2 years
RSS Infrastructure has been engaged in this high-profile HS2 project for over a year, attending all pre-planning meetings from T-52 to delivery. A high level of local knowledge and experience within the planning team has been key to the project’s success.
Working with Skanska’s on-site and Network Rail Route teams from the planning stage to delivery on-site has resulted in a great working relationship. The collaboration has flourished due to the regular flow of information and updates from all parties involved.
Working with a single-source supplier has several advantages. The client gains access to a multi-skilled workforce that can deliver isolation and worksite management.
On Track Plant (OTP) Planning and Management was a vital part of the planning and management, ensuring that all the necessary equipment and personnel were available at the appropriate times. On the project, RSSI also provided package works, which included safety-critical staff, resulting in cost savings and increased productivity for the client on-site.
RSS Infrastructure delivers a team briefing on the specific tasks to be done before the start of each shift as part of the delivery programme.
Contact John Byrne, Head of Rail Operations, to discuss your Possession Management needs on your next project.
RSS Infrastructure (RSSI), based in Birmingham, Cwmbran, Doncaster and Tonbridge, provides infrastructure services for the rail, civil, and utilities sectors. We serve clients like Network Rail, WMCA, HS2 and Tier 1 & 2 contractors. Our services include Arboriculture, Civils and Construction, Geofencing, Industrial Rope Access (IRATA), Magnetic Track Safety, Rail Operations including Possession Management and P/Way, Rail Welding, Signalling, and Track Warning Services.
RSS Infrastructure (RSSI) undertook a challenging project to remove vegetation from a railway road bridge and a footbridge.
Taziker was awarded a contract to replace life-expired wheel timbers on a series of bridges in the Manea area between Ely and March.
Welding S&C Unit was contracted to work on Phase 2 of the Birmingham Midland Metro Alliance or MMA Westside Extension.
Copyright © 2024 RSS Infrastructure Ltd.
Company Registration No. 06278727
Get notified about new articles