West Hampstead Maintenance Depot

“RSS Infrastructure’s flexible staffing solutions have been crucial in enabling completion of maintenance and minor renewals at the West Hampstead Maintenance Depot on time and to the highest standards. Our skilled signalling teams have been invaluable in boosting the team size for night shifts and ensuring the safety and reliability of the signalling systems.”
Victor Heath, Head of Signalling

Services Delivered

As part of the Network Rail Framework Agreement for the Provision of Labour Services, RSS Infrastructure has been supplying signalling teams to assist in the regular depot maintenance and minor renewals carried out by Network Rail at West Hampstead. The RSS Infrastructure staff is competent in various signalling equipment and fault-finding experience, enabling them to support the teams carrying out maintenance and faulting.

Key Actions

  • Supplied signalling teams to assist in the regular depot maintenance and minor renewals.
  • Provided staff to boost team size for day or night shifts.
  • Ensured that all staff were competent in various signalling equipment and fault-finding experience.
  • Supplied staff with the latest version of Network Rail standards to work on-site.
West Hampstead Maintenance Depot
location-icon

Location

West Hampstead

Werrington Grade Separation, RSS Infrastructure

Project Value

£116,000

Werrington Grade Separation, RSS Infrastructure

Division

Signalling

Werrington Grade Separation, RSS Infrastructure

Project Duration

Ongoing

Project Delivery

As part of the Network Rail Framework Agreement for the Provision of Labour Services, RSS Infrastructure has been supplying signalling teams to assist in the regular depot maintenance and minor renewals carried out by Network Rail at West Hampstead. This includes providing staff to boost team size for night shifts, ensuring that maintenance and minor renewals are completed on time and to the highest standards.

The RSS Infrastructure staff is competent in various types of signalling equipment, including track circuits, axle counters, filament signals, LED signals, various point operating equipment, earth readings, and voltage and current readings. They also have fault-finding experience, which is invaluable to Network Rail due to the nature of the work being carried out.

To ensure the safety and reliability of the signalling systems, all staff supplied by RSS Infrastructure were issued with the latest version of Network Rail standards, which they work to on-site. This included the NR/L3/SIG/10064 General Instructions to Staff Working on S&T Equipment Issue 10 04/12/2021, NR/L3/SIG/10663 Signal Maintenance Specifications Issue 18 04/12/2021, and NR/L3/SIG/11231 SMTH Work Instruction Issue 16 04/12/2021. By supplying skilled signalling teams on an ongoing basis, RSS Infrastructure has provided flexible staffing solutions that enable Network Rail to complete maintenance and minor renewals, even if faults are reported and some team members have to leave to attend to them. This ensures that the West Hampstead Maintenance Depot signalling project is completed on time and to the highest standards.

About Us

RSS Infrastructure provides multi-disciplinary infrastructure services for the rail, civil and utilities sectors. With offices in Birmingham, Cwmbran, and Doncaster, RSSI works with several clients, including Network Rail, WMCA, Midland Metro Alliance, HS2 as well as Tier 1 & 2 contractors. Services offered include; Arboriculture, Construction & Civils, Magnetic Track Safety, Possession Management, Rail Operations, Safety-Critical Resource, Signalling, Track Warning Services, and Welding.

Projects

York Tram Line
Welding

York Place to Newhaven Extension

“The complexities of this project presented significant challenges, from inexperienced subcontractors to unforeseen circumstances like COVID-19. However, our dedicated and experienced team at RSSI delivered

Read More »
Nottingham Tram Extension
Welding

Nottingham Tram Extension

“Through our collaboration with the civil teams and leveraging our extensive experience within the light rail sector, we were able to overcome significant obstacles, accelerate

Read More »