Vegetation Removal from Rail Road Bridge and Footbridge
RSS Infrastructure (RSSI) undertook a challenging project to remove vegetation from a railway road bridge and a footbridge.
Home | TSR/ESR Speed Warning Equipment Installation
Track Warning Services has experience using leading technologies for patrolling and installing speed warning equipment on major infrastructure projects. They became the preferred supplier to Amey Colas for the West Coast Main Line project and provided Critical Rail Temperature Monitoring. RSSI collaborated with Amey Colas to identify project factors and produced an Interface Network Map outlining responsibilities, objectives, stakeholders, methodology, milestones, resources, cost and access.
Location
West Coast Mainline
Project Value
£50,000
Division
Track Warning Services
Project Duration
10 Weeks
RSSI supplied fully trained and experienced CRT Operatives, including a Controller of Site Safety, Protection Controller, and two team members stationed on both the up and down roads positioned near the adjoining access.
RSSI was assigned to support in the delivery of Amey Colas’s pre-planned works where stressing had failed to be achieved during the track renewals by monitoring the track temperature and quality until we had achieved full stressing. The team took the temperature every 30 minutes using CRT Thermometers every 30 minutes and cross levelling and visual inspections to check track condition. To provide a comprehensive and accurate reading, the team used a combination of Magnetic Gauges to take the temperature of all three locations to calculate the average temperature and use a laser thermometer from the nearby place of safety.
RSSI also supplied and installed EROS Board, including relevant speed signs commencement boards, repeater board and termination boards. RSSI has achieved a 5* RISQS approval rating for the last eight years. Our in-house, fully qualified Safe System of Work Planners and the Track Services team are experienced in deploying these types of systems. They ensured Amey Colas benefited from a solution that conformed to the NR/L2/OHS/019 standard. RSSI supported Amey Colas in this process by assisting with the development of the Work Package Plan/Task Brief, and all work was completed under line blockage.
RSSI delivered all works with no over-runs and in line with agreed costs and project milestones.
RSS Infrastructure (RSSI), based in Birmingham, Cwmbran, Doncaster and Tonbridge, provides infrastructure services for the rail, civil, and utilities sectors. We serve clients like Network Rail, WMCA, HS2 and Tier 1 & 2 contractors. Our services include Arboriculture, Civils and Construction, Geofencing, Industrial Rope Access (IRATA), Magnetic Track Safety, Rail Operations including Possession Management and P/Way, Rail Welding, Signalling, and Track Warning Services.
RSS Infrastructure (RSSI) undertook a challenging project to remove vegetation from a railway road bridge and a footbridge.
Taziker was awarded a contract to replace life-expired wheel timbers on a series of bridges in the Manea area between Ely and March.
Welding S&C Unit was contracted to work on Phase 2 of the Birmingham Midland Metro Alliance or MMA Westside Extension.
Copyright © 2024 RSS Infrastructure Ltd.
Company Registration No. 06278727
Get notified about new articles