In Washwood Heath, Birmingham, RSSI’s team was tasked with constructing
temporary foundations for a 95m single span weathering steel truss bridge, a project named SAS13. Our client, Skanska, entrusted us with a challenging scope of work, which included excavations, steel fixing, construction of temporary works, concrete pouring, and reinstatement works.

Key Actions

  • Excavated two pile caps (14m x 7.8m x 1.2m) and eight trestle pads (3.6m x 3.6m x .5m)
  • Executed steel fixing for two pile caps, involving 16t of steel each
  • Constructed temporary works using Minima Formwork
  • Conducted a concrete pour for pile caps and trestle pads, amounting to 300 m3 of concrete
  • Undertook reinstatement works of Area 5 to Highway Standards
1622653379923
location-icon

Location

Birmingham

Werrington Grade Separation, RSS Infrastructure

Project Value

£176,312

Werrington Grade Separation, RSS Infrastructure

Project Duration

2 Months

Project Delivery

The SAS13 Temporary Bridge Foundations project was a complex task that necessitated precision and expertise in various aspects of construction. Our team, under the excellent leadership of the RSSI Construction Manager, rose to the challenge and successfully delivered on all fronts.

Our tasks began with the excavation of two large pile caps and eight trestle pads. Following this, the team managed to fix 16 tons of steel into each of the two pile caps, a task demanding meticulous precision and safety precautions.

Using Minima Formwork, we built temporary works, demonstrating our
adaptability to different construction methods and systems.

The next phase involved a significant concrete pour for the pile caps and trestle pads, which required exact measurements to ensure the stability of the temporary bridge foundations.

Finally, we carried out reinstatement works in Area 5 to meet Highway
Standards, underscoring our commitment to restoring and improving the
infrastructure of the sites we work on.

Despite the project’s challenges, our team’s hard work and commitment
enabled us to deliver the project as per the program and to a high standard,
reinforcing our reputation as a reliable and efficient construction partner.

About Us

RSS Infrastructure provides multi-disciplinary infrastructure services for the rail, civil and utilities sectors. With offices in Birmingham, Cwmbran, and Doncaster, RSSI works with several clients, including Network Rail, WMCA, Midland Metro Alliance, HS2 as well as Tier 1 & 2 contractors. Services offered include; Arboriculture, Construction & Civils, Magnetic Track Safety, Possession Management, Rail Operations, Safety-Critical Resource, Signalling, Track Warning Services, and Welding.

Projects

York Tram Line
Welding

York Place to Newhaven Extension

“The complexities of this project presented significant challenges, from inexperienced subcontractors to unforeseen circumstances like COVID-19. However, our dedicated and experienced team at RSSI delivered

Read More »
Nottingham Tram Extension
Welding

Nottingham Tram Extension

“Through our collaboration with the civil teams and leveraging our extensive experience within the light rail sector, we were able to overcome significant obstacles, accelerate

Read More »
Receive the latest news

Subscribe To Our Newsletter

Get notified about new articles