Vegetation Removal from Rail Road Bridge and Footbridge
RSS Infrastructure (RSSI) undertook a challenging project to remove vegetation from a railway road bridge and a footbridge.
Home | Retaining Wall
“RSS Infrastructure installed a combination of fencing solutions designed for low maintenance combined with high levels of security and longevity on all three sites.”
RSSI was commissioned to construct and erect a training wall along the Barking line at Essex Road. These works were carried out during possession and involved the use of a RRV to facilitate completion of the job.
Location
Barking
Project Value
£N/A
Division
Civils & Construction
Project Duration
2 Weekends
Our project team applied their experience and expertise from similar retaining wall projects to plan, manage and successfully deliver the works to Morgan Sindall.
During the construction, RSSI was responsible for lifting concrete gravel boards into position between the posts, sliding them into place, and ensuring the boards were level between the posts. This process was repeated until the designated height was achieved.
The base was then dug to the required depth by hand, and the Terram was installed.
Once the Terram had been installed, the excavation was backfilled with MOT Type 1 stone. Our supervisor oversaw all works and ensured compliance with relevant safety requirements as per the safe system of work.
RSS Infrastructure (RSSI), based in Birmingham, Cwmbran, Doncaster and Tonbridge, provides infrastructure services for the rail, civil, and utilities sectors. We serve clients like Network Rail, WMCA, HS2 and Tier 1 & 2 contractors. Our services include Arboriculture, Civils and Construction, Geofencing, Industrial Rope Access (IRATA), Magnetic Track Safety, Rail Operations including Possession Management and P/Way, Rail Welding, Signalling, and Track Warning Services.
RSS Infrastructure (RSSI) undertook a challenging project to remove vegetation from a railway road bridge and a footbridge.
Taziker was awarded a contract to replace life-expired wheel timbers on a series of bridges in the Manea area between Ely and March.
Welding S&C Unit was contracted to work on Phase 2 of the Birmingham Midland Metro Alliance or MMA Westside Extension.