The RSSI Rope Access department was contracted by Network Rail to address the issue of overhanging vegetation at Birmingham New Street Train Station. The project aimed to ensure the safety and efficiency of the Overhead Line Equipment (OLE) by removing vegetation that posed a potential electrical hazard. The project was completed within four weeks.
Location
Birmingham
Project Value
£74,000
Division
Industrial Rope Access
Project Duration
4 Weeks
The project’s background stemmed from Network Rail’s proactive approach to maintaining the safety and efficiency of their OLE at Birmingham New Street Train Station. The primary concern was the overgrown vegetation intruding upon the OLE, posing a significant electrical hazard. Recognising the gravity of the situation, Network Rail promptly sought the expertise of the RSSI Rope Access department. RSSI provided an effective solution by employing rope access techniques, allowing the team to access challenging areas easily.
The highly skilled RSSI team swiftly removed the overgrown vegetation, offering a practical, cost-effective solution. This approach ensured the safety of the railway infrastructure and enhanced the station’s visual appeal for passengers and staff.
The project was executed seamlessly, with the teams completing the work scope on time and according to the planned programme, highlighting the collaboration’s value and efficiency.
RSS Infrastructure (RSSI), based in Birmingham, Cwmbran, Doncaster and Tonbridge, provides infrastructure services for the rail, civil, and utilities sectors. We serve clients like Network Rail, WMCA, HS2 and Tier 1 & 2 contractors. Our services include Arboriculture, Civils and Construction, Geofencing, Industrial Rope Access (IRATA), Magnetic Track Safety, Rail Operations including Possession Management and P/Way, Rail Welding, Signalling, and Track Warning Services.
RSS Infrastructure (RSSI) undertook a challenging project to remove vegetation from a railway road bridge and a footbridge.
Taziker was awarded a contract to replace life-expired wheel timbers on a series of bridges in the Manea area between Ely and March.
Welding S&C Unit was contracted to work on Phase 2 of the Birmingham Midland Metro Alliance or MMA Westside Extension.
Copyright © 2024 RSS Infrastructure Ltd.
Company Registration No. 06278727